Tuesday, August 17, 2021
Lid and Lifter
Sunday, August 15, 2021
Lid and Lifting Mechanism
Sunday, August 08, 2021
Lid Insulation Work
Saturday, August 07, 2021
Heat Up Rate Testing
The pipe support clamps will support the lifting mechanism.
I cannot assemble the lid until the lifting mechanism is fastened to the side of the drum.
This morning I installed a 3-amp fuse and fuse holder in the power supply line to the PID controller, and I put a spade-type disconnect in the control line to the SSRs. I put the disconnect inline so that I will be able to easily open the circuit and install the door safety limit switch in the future.
After disturbing all of the wiring, I thought it would be a good idea to plug in the furnace and test it. I installed ceramic wool insulation in the drum since the last time we heated it up.
When I turned the controller on, it was at 20 °C - room temperature. I changed the set point temperature to 750 °C and began to monitor the heat up. I placed two firebrick over the heating chamber as a temporary lid, like before.
With ceramic wool insulation the heat up rate was faster than before. It is about 27 °C / minute now. Plus, the steel furnace shell never got hot - it remained at room temperature. So, now I know that I will not have to rebuild the furnace into a larger steel drum.
It took 27 minutes and 17 seconds to come to 750 °C. I am sure it will be a little longer when there is a metal charge in the chamber to melt, but the completed furnace will also have a heavy and well-insulated lid to hold in more heat.
I have read about other electric foundry furnaces in online forums and most report very slow heat ups of over an hour. So, I am pleased that my little furnace performs so well.